What to Send Your Fabricator for an Accurate Misc. Metals Quote

By · · 4 min read

Black steel horizontal-bar guardrails on a multi-level exterior deck

The short answer

To get an accurate misc. metals quote, send your fabricator the full drawing set with addenda, the Division 05 specifications, the finish requirements, the schedule, and a clear statement of what you want priced: fabricate only, fabricate and deliver, or fabricate and install. Most bad numbers come from missing information, not from bad estimating. The more of the scope you define up front, the less you'll be sorting out in change orders later.

Here is what we look for when a bid package comes in, and why each piece matters.

What documents should be in a misc. metals bid package?

Start with the documents. A fabricator can only price what they can see.

  • Complete drawing set. Architectural, structural, civil and MEP sheets. Metals turn up everywhere: bollards on civil, equipment frames on mechanical, lintels on architectural elevations.
  • All addenda and ASIs issued to date. List them by number so everyone is pricing the same revision.
  • Project specifications. At least Division 05 sections such as 05 50 00 Metal Fabrications, 05 51 00 Metal Stairs and 05 52 00 Metal Railings, plus Division 01 general requirements.
  • Finish schedule. Paint, primer, galvanizing and powder coat requirements, with colors if known.
  • Geotechnical or site notes if items are embedded in soil or concrete.

If you only send the metals sheets, expect the fabricator to exclude anything not shown on them.

How do you define the scope clearly?

A scope sheet or bid form keeps quotes comparable. Spell out:

  • Supply type. Fabricate only, fabricate and deliver to site, or fabricate, deliver and install.
  • Items included and excluded. For example: include stairs, rails, lintels, bollards; exclude structural steel frame, metal deck and joists.
  • Embeds and anchor bolts. Who supplies them, who sets them, and when they are needed relative to the concrete schedule.
  • Engineering. Whether stairs, railings, ladders or canopies are delegated design items that need stamped calcs.
  • Shop drawings. Required submittal format and number of review cycles assumed.
  • Field verification. Whether the fabricator is expected to field measure before fabrication.

What finish information does the fabricator need?

Finish can be a large share of the cost and the schedule, so it should never be left as "per spec" without the spec attached.

Finish Typical use What to tell the fabricator
Shop primer Interior steel to be field painted Primer type, compatibility with the finish coat, who does the topcoat
Hot-dip galvanizing (ASTM A123) Exterior and exposed steel Which items, and whether any are also painted over the galvanizing
Galvanized plus paint or powder coat (duplex) Exterior architectural items Color, gloss, and any surface prep requirement
Powder coat Railings, exposed architectural metal Color, interior vs. exterior grade
Bare or mill finish Embedded or concealed items Confirm no coating is required

Also note any field touch-up requirements and who is responsible for them after installation.

What schedule and logistics details matter for the price?

Where and when material arrives affects labor, trucking and storage.

  • Project location and site access, including any delivery restrictions
  • Required on-site dates for embeds, stairs and rails, tied to the overall schedule
  • Whether you want one delivery or phased deliveries
  • Lifting and unloading: who provides the forklift or crane at the site
  • Storage space on site, if any
  • Installation sequence, if installation is included

For projects around Northwest Arkansas, include the job site address so the fabricator can price trucking and travel realistically.

What commercial terms should you include?

These don't change the steel, but they do change the number.

  • Bonding requirements
  • Insurance requirements and any special endorsements
  • Retainage and payment terms
  • Prevailing wage or other labor requirements
  • Contract form, if you have a standard subcontract
  • Any owner-specific site safety or badging requirements

How do you compare misc. metals quotes fairly?

Put the quotes side by side against your scope sheet, not against each other. For each bidder, check:

  • Which addenda they acknowledged
  • What they excluded, line by line
  • Whether finish matches the spec for each item
  • Whether engineering and shop drawings are included
  • Whether delivery and installation are included
  • Any assumed quantities or allowances

If a quote is much lower, it usually left something out. Ask the bidder to confirm scope in writing before you carry the number.

What makes a fabricator's job easier during the bid?

A few habits make a quote faster and more reliable:

  • Send a single link or folder with the full current set, not scattered emails.
  • Flag known issues, such as conflicts between architectural and structural sheets.
  • Give a bid due date and a realistic window for questions.
  • Name one contact for RFIs during bidding.
  • Tell the fabricator if the drawings are not final and pricing should be budgetary.

What happens after the quote is accepted?

Knowing the next steps helps you plan the schedule realistically. On most misc. metals packages the sequence looks like this:

  • Shop drawings are prepared from the contract documents and submitted for review.
  • The design team reviews and returns them, sometimes with revisions that need another cycle.
  • Field dimensions are verified where items fit to existing or as-built conditions.
  • Material is ordered and fabrication begins after approved drawings are released.
  • Finished items are coated, then delivered in the sequence the job needs.

Delays in shop drawing review or field verification push everything behind them, so build that review time into your schedule from the start.

Shop Facts

Prairie Grove, AR
Shop located in Northwest Arkansas
9,500 sq ft
Fabrication shop
48" × 96"
CNC sheet and plate cutting, up to full sheets
Laser · Plasma · Bending · Cobots
CNC laser and plasma cutting, CNC tube and plate bending, welding cobots
$2M
Insurance coverage, with additional coverage available
AR · OK · MO · TN · TX
Serving Arkansas, Oklahoma, Missouri, Tennessee and Central/East Texas

Next step

Gather the current drawing set, addenda list, Division 05 specs, finish schedule and a short scope sheet that says what you want priced. Then send the package through the button below and note your bid date. If something in the documents is unclear, it's better to settle it in an RFI during bidding than in a change order later.

Ready when you are.

Send your bid package

Frequently Asked Questions

+What is included in miscellaneous metals?

Miscellaneous metals usually covers steel items that are not part of the main structural frame, such as stairs, railings, ladders, lintels, bollards, embeds, angles, canopy framing and equipment supports. The exact scope is defined by the project specifications, often Section 05 50 00.

+Why do misc. metals quotes vary so much between fabricators?

Usually because each fabricator assumed a different scope. Differences in finish, installation, engineering, field measuring, delivery and addenda account for most of the spread.

+Who provides engineering for stairs and railings?

On many projects the specs make stair and railing design a delegated design item, which means the fabricator provides calculations and drawings stamped by a licensed engineer. Check the specs and ask each bidder whether engineering is included.

+Should I send the full drawing set or just the metals sheets?

Send the full set if you can. Misc. metals items show up on architectural, structural, civil, MEP and landscape sheets, and items missed on those sheets are a common source of change orders.

About the author

Kaden Stuart

Partner / Manager, Hogeye Custom Fabrication

More from Kaden →

Not ready for a quote yet?

Get new guides, design ideas and recent project photos by email. A few times a year, no spam.