How to Plan a Custom Steel Driveway Gate (Before You Pour the Posts)
By Kaden Stuart · · 5 min read
The short answer
The time to plan a custom steel driveway gate is before the drive is paved and before the posts or footings are poured. Most of the expensive problems with gates come from decisions made by default at that stage: posts too light or too close together, no conduit for an operator, or a slope that the gate can't clear. If you settle gate type, size, weight, power and footings early, the steel part goes smoothly.
This guide walks through the order we would think about it in, from the site to the hardware.
What should you decide first about a driveway gate?
Start with the site, not the design. A great-looking gate that doesn't fit the drive or the grade will cause trouble for years.
Walk the entry and note:
- Opening width. Measure the drive at the gate line, then decide on the clear opening you want. Account for delivery trucks, trailers and emergency vehicles.
- Slope. Note whether the drive rises, falls or cross-slopes through the gate line. Swing gates need the leaves to clear the ground through their whole arc.
- Setback from the road. A car waiting for the gate to open should be fully off the road. Many owners want room for at least one vehicle, more if they get deliveries or tow trailers.
- Fence line and side room. Slide gates need clear space beside the opening to roll back into.
- Drainage. Water running down the drive toward the gate line will find any low spot at the posts or track.
Should the gate swing or slide?
This is the biggest decision, because it drives post size, footings and operator choice.
| Consideration | Swing gate (single or double) | Slide gate (cantilever or track) |
|---|---|---|
| Best for | Level or gently sloped drives with open space | Sloped drives, short setbacks, tight sites |
| Space needed | Clear arc inside the property | Run-back room along the fence |
| Post loads | High bending at hinge posts | Load spread across support posts or track |
| Snow, ice, debris | Leaves can hang up on drifts or gravel | Track styles can clog; cantilever stays off the ground |
| Operator types | Arm or underground swing operators | Rack-and-pinion slide operators |
| Typical cost drivers | Hinge posts, footing size, two leaves | Longer frame, rollers, run-back length |
A cantilever slide gate hangs on rollers mounted to posts beside the opening, with a counterbalance section that extends past the opening. That extra frame length is often around half the opening width, but it varies with the gate design. It keeps the gate off the drive surface, which helps on gravel. A track gate rolls on a ground track across the opening and needs a clean, level path.
A double swing gate reduces the length of each leaf, which lowers the load on each hinge post compared with a single wide leaf.
How do you size posts and footings for a steel gate?
A steel gate is heavy, and a swing leaf acts like a long lever on the hinge post. Light posts or shallow footings are the most common reason a gate starts dragging or won't latch after a year or two.
Get the following before the footings are designed:
- Estimated gate weight. Ask your fabricator once the design is roughed out. Solid infill and decorative panels add a lot.
- Leaf width and height. These set the bending load on the hinge post.
- Post size and wall thickness. Steel tube or pipe posts are common. The fabricator can tell you what the gate needs.
- Footing design. Footing depth and diameter depend on the soil, the loads and frost depth. Northwest Arkansas has varied soils, including rocky ground in many areas, so drilling conditions can also affect the plan.
- Post embed or base plate. Decide whether posts are set in concrete or bolted to a base plate on a pier. Base plates make replacement easier but need anchor bolts set accurately.
Set the post spacing to the gate's design dimensions, not the other way around. Have the fabricator confirm the dimension between posts, and verify it after the pour before the gate is built if the gate is measured to the posts.
What should go in the ground before the concrete?
Once the drive is finished, adding anything underground costs time and concrete. Plan these with the electrician and concrete sub:
- Conduit for operator power from the house or service
- Separate conduit for low-voltage wiring: keypad, intercom, camera, photo eyes, loop detectors
- Sleeves under the drive for wiring from one side of the gate to the other
- Locations for a keypad or call box pedestal at car-window height
- Vehicle detection loops cut into or set under the drive, if the operator will use them
- Any embedded plates, sleeves or anchor bolts the gate design requires
What safety rules apply to automatic gates?
Automated gates can trap and crush. That's why there are standards specifically for them.
- UL 325 covers gate operators and requires entrapment protection, such as photo eyes and edge sensors, depending on the gate type and use.
- ASTM F2200 covers gate construction, including limits on openings in the gate that could catch hands or arms and guarding of rollers on slide gates.
A gate built for manual use isn't automatically suitable for an operator. If the owner may automate it later, tell your fabricator now so the gate and posts are built for it. Your installer and local inspector can confirm what applies to the specific installation.
What design details should you pin down with the fabricator?
With the site and structure settled, the look comes next. Questions to answer:
- Style: pickets, flat bar, solid panels, laser-cut patterns, wood or other inserts in a steel frame
- Privacy level: open, partial or full
- Top shape: flat, arched or stepped
- Finish: exterior steel generally needs a coating system built for outdoor exposure, often galvanizing with powder coat over it
- Hardware: hinges sized for the weight, latches, drop rods for double gates, manual release
- Matching elements: pedestrian gate, fence panels, mailbox, address plaque
Next step
Before the posts are poured, put together the drive width, a photo or two of the entry, the slope, whether you want swing or slide, and whether it will be automated. With that, a fabricator can rough out gate weight and post requirements so the footings and conduit are right the first time. Use the button below to start a gate plan with us.
Ready when you are.
Start your gate planFrequently Asked Questions
+Should a driveway gate swing or slide?
Swing gates are simpler and work well on level drives with room for the leaves to open. Slide gates suit sloped drives, short setbacks and tight spaces, but they need clear run-back room along the fence line.
+How deep should driveway gate posts be set?
It depends on the gate weight, leaf width, soil and local frost depth, so the footing should be sized for the specific gate. Ask your fabricator for the gate weight and hinge loads and have the footing designed for them, and confirm frost depth with the local building department.
+What needs to be in place before the posts are poured?
Conduit for power and low-voltage wiring, any embedded plates or sleeves, and the final post locations relative to the drive and property line. Running conduit after the drive is finished usually means cutting concrete or trenching.
+Are there safety standards for automatic gates?
Yes. Gate operators are generally listed to UL 325, and ASTM F2200 covers the construction of automated vehicular gates. Both address entrapment protection such as photo eyes, edge sensors and guarding of rollers and gaps.